This work was carried out between August and end November 2020 by tradesmen working for Armour Hart Group Ltd. on a first floor flat at Links Road W3 0EL. The work was supervised by RICS surveyor John Chandler.
See also these Before and After photos of repairs to the bay window at the front of this flat.
See also 10 major problems with the 2019-2020 HHGE window repairs














