The photographs above that show the multiple problems with a single cill are just one example of hundreds of problems with the 2019-2020 HHGE External Works program. In summary these problems as highlighted above are;
- Use of substandard materials: i.e. cracked wood.
- Use of incorrect materials: Cill has no throat or drip groove.
- Poor planning: Why has this cill been exposed to the elements for 3 months ?
- Poor supervision: Why have these faults not been picked up previously either the HHGE Board of Directors or the Contract Manager ?