The EarlKendrick Snagging Survey 27 April 2021

Background to the EarlKendrick Snagging Survey delivered on 27 April 2021.

 

TYPE OF DEFECT QNTY
Peeling or delaminated paint due to poor workmanship 23
Rotten wood painted over in breach of the RepairCare specification 17
Separation Gap or open joint in breach of the RepairCare specification 16
Skirting Board used on external window repairs in breach of AHG contract spes 5
Paint overruns, drips or spillages 42
Defective lead glazing on the leaded light windows 3
Rusty steel windows not treated with rust inhibitor 14
Inappropriate use of wood filler epoxy resin or expanding foam 2
Slipped tile 3
Part finished decorations or prep work 9
Un-started work (not touched) 7
Total 141

Follow Up

The Problem

  1. As described by James Paul of EK it is a fact that the AHG tradesmen used paint to cover up rotten wood in many cases.
  2. However, without “opening up” the defective work it is impossible to find out if the repairs were carried out according to the specification or not.
  3. From personal observations it appears that EarlKendrick never snagged other than the ground floor flats.
  4. From personal observation defects are much more common on the first and top floor flats than  ground floor flats for two reasons. Working from ladders is much more difficult than working from scaffolding and no surveyor likes climbing ladders to inspect work.
  5. For these 2 reasons numerous flats on the HHGE on the first and second floors with seriously defective work were never snagged.
  6. Two examples are top floor flats such as Flat 31 Ayr Court and Flat 6 Essex House which have seriously rotten window cills and there are many other examples.
  7. Rotten wood concealed under paint will continue to rot and means that the whole project is worthless  e.g 3 Essex House.

210427 EARLKENDRICK REPORT by James Paul