Skip to content

HHGE FLAT OWNERS ASSOCIATION

Res ipsa loqitur

2019 External repairs, Essex House W3 0EJ, Rotten window frames

3 Essex House: Rotten wood painted over at 23 November 2020

Date: November 23, 2020Author: uluulublog 2 Comments

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Published by uluulublog

View all posts by uluulublog

Post navigation

Previous Previous post: 3 Essex House: Rotten wood covered over with sub-standard materials 6 August 2020
Next Next post: Essex House: Defective repairs 23 November 2020

2 thoughts on “3 Essex House: Rotten wood painted over at 23 November 2020”

Add Comment

  1. Pingback: 10 major problems with the 2019-2020 HHGE window repairs – HHGE FLAT OWNERS ASSOCIATION
  2. Pingback: The EarlKendrick Snagging Survey 27 April 2021 – HHGE FLAT OWNERS ASSOCIATION

Leave a Reply Cancel reply

HHGE FLATS DOCUMENTS

HHGE FLATS BLOCKS

HHGE FLATS MAINTENANCE PROBLEMS

GARDEN PROBLEMS

CONTACT HHGE SHAG

c/o Japan Services, 2 Queens Drive, West Acton, London, W3 0HA
0208 752 0445
9:00-7:00 Monday- Friday
10:00-4:00 Saturday

© 2023 HHGE FLAT OWNERS ASSOCIATION

Powered by WordPress.com.

 

Loading Comments...
 

    %d bloggers like this: