External Window repairs at Hereford House W3 0HX
Interim Report on works as at 21 October 2025
- New hardwood (Sapele) cill inserted to replace rotten previous original cill. Good quality wood but the end grain was left unsealed for a 3 days in wet weather.
- No repairs carried out to the black plated studs which have been inset into the exterior render which are in very poor condition
- Some rotten wood covered up with new wood bottom LHS of front window.
- New timber left uncovered outside overnight in wet weather most days.
- Scaffolding should not be removed until the rotten plated studs have been replaced.
- Flat occupant reports that water comes through the ceiling during rain presumably due to the rotten plated studs.
- If the scaffolding is removed before the black studs are renewed then it will be extra expense to put it up again later.