Site icon HHGE FLAT OWNERS ASSOCIATION

Problems with the 2019 HHGE External repairs 01

This rotten window cill was painted over in in November 2019 to conceal the internal rot. By Jan 2020 because the rotten wood was damp, a part of the new paint was flaking off. Further inspection showed that the whole cill was completely rotten inside. Location recorded in our database.
Exit mobile version